Инженер строительного контроля по защитному покрытию, покраске, изоляции( ИКЦ ТЕХИНКОМ )
Описание
Kyazimov Sattar Tofik oglu
Mobile : +994 (55 ) 305 -18-91
Е-mаil: settar.kazimov@gmail.com
Date of birth : 16.04.1994
Citizenship : Azerbaıjan
Address : Baku, Pirallahi, Sergey Murtuzaliyev street 24/7
EDUCATİON
Karabuk Unıversity in Turkey 201 5 – 20 19
Department : Management
Academic degree : Bachelor
Certificates
BGAS CSWIP
Painting Inspector Level 2 (19.08.2020 -23.08.2025)
ICORR
Coating Inspector Grade 2 (21.03.2022 -21.03.2027)
(TEC/TUV)
Piping Engineering (05.09.2019)
BOSIET
Basic Offshore Safety Induction and Emergency Training
Experience
Company: SOC AR CAPE LLC ( February 2022 – Present )
Client: JOCAP, BP, TOTAL, UBOC, SOCAR
Location: Baku Deep Water Jacket Factory (Absheron EPS project)
Position: Painting, Coating and Insulation Inspector
Inspection of material storage, absence of contamination, batch numbers, expiry dates, sample retention.
Inspection of abrasive for surface preparation (type and size, storage conditions, batch numbers)
Ambient conditions monitoring (Elcometer 319), checking compressed air quality (BLOTTER test as per ASTM D 4285)
Checking blasted surface cleanliness (as per ISO 8501 -1), profile (Elcometer 124;125;224)
Soluble salts concentration (Elcometer 130; Bresle Method), oil/dust contamination.
Visual inspection of the applied coating, dry film thickness (according to SSPC PA2)
Holiday Detection (Elcometer 236;266;270;280)
Adhesion testing (Dolly pull of gauge adhesion tester)
Stainless steel / CRA pickling & passivation
PH checking (Ph papers or Ph sticks)
In-service maintenance, repair and partial re -coating of Pipes, Vessels, Tanks, Steel Structures etc.
Insulation inspection ( Rockwool, Armaflex, Acoustic , insualtion)
Documentation management of the listed activities, reporting.
Field joint coating database management.
Resolving NCR in all stages of painting /coating/insulation/blasting activity & follow up of corrective action
implementation in latter stages.
Follow Isometric and P&ID drawings for insulation and painting requirement as per p roject specification.
Ensure that the work is performed safely and in compliance with client's HSE requirements and objectives.
Passive fire protection (PITT -CHAR XP)
Company: AZFEN LLC ( August 20 19 – February 2022)
Client: SOCAR, Tecnicas Reunidas
Location: Haydar Aliyev Oil Refinery (HAOR)
Position: Painting, Coating and Insulation Inspector
Experience :
Steel work visual examination (ISO 8501 -03)
Inspection of material storage, absence of contamination, batch numbers, expiry dates, sample retention.
Inspection of abrasive for surface preparation (type and size, storage conditions, batch numbers)
Ambient conditions monitoring (Elcometer 319), check ing compressed air quality (BLOTTER test as per ASTM D
4285)
Checking blasted surface cleanliness (as per ISO 8501 -1), profile (Elcometer 124;125;224)
Conductivity of abrasives test (ASTMD 4940)
Ferroxyl test (ASTM A380)
Dust test(ISO 8502 -4)
Stainless steel / CRA pickling & passivation
PH checking (Ph papers or Ph sticks)
Thermal spray aluminium
Passive fire protection (PITT -CHAR XP)
Insulation inspection ( Rockwool, Armaflex, Acoust ic insualtion)
Passive fire protection (Isolatek type 2 )
Company: AZFEN LLC (March 2014 – June 2015 )
Client: SOCAR,BP
Location: Sangachal (ShahDeniz 2)
Position: Technical Assistant
LANGUAGES
AZERBAIJAN I-C2; RUSSIAN -C2; TURKISH -C2; ENGLISH -B1 ; ARABIC -A2
24 ноября, 2022
Любовь Владимировна
Город
Южно-Сахалинск
Возраст
47 лет (12 октября 1977)
20 ноября, 2021
Никита
Город
Южно-Сахалинск
Возраст
55 лет (21 июля 2025)
24 ноября, 2021
Букин Алексей
Город
Южно-Сахалинск
Возраст
55 лет (21 июля 2025)