Piping Designer

от 09 Февраля 2024

Budi

Город

Южно-Сахалинск

Зарегистрируйтесь или войдите, чтобы увидеть контакты соискателя

Описание

BUDI ARPIANTO
Sr. Piping Designe r
PROFILE
Total car rier more than 20 years of
professional experience in Piping and
Mechanical.
CONTACT
PHONE:
+218 910 347 342
+62 813 1470 0610

DATE OF BIRTH:
28th January 1974

CURRENT POSITION:
Jakarta, Indonesia

ADDRESS:
Tangerang City, 15153, Indonesia

EMAIL:
dudiarpi@gmail.com
MARKET SECTORS
Offshore Platform
FPSO
LNG
Powerplant
Petrochemical
Shipbuilding

EDUCATION
1994 – 1997
- Diploma of Polytechnic Shipbuilding – Institut Teknologi Sepuluh
Nopember (ITS)

1998 – 2001
- Naval Architect – Institut Teknologi Adhi Tama Surabaya
COURSE
11 - 26th June 2011, PDMS Piping Mechanical – PI.n.D Oil and Gas Design
Course, Jakarta

8-23th September 2017, SMARTPLANT 3D Piping Mechanical – PI.n.D Oil
and Gas Design Course, Jakarta
OVERSEAS EXPERIENCE
Libya, Turkmenistan, Malaysia, Singapore
LANGUAGE
English, Malay, Indonesia
SKILLS : ( expert al using )
PDMS (E3D), SP3D, NAVISWORKS, Auto Cad PLANT 3D / Spec Editor and
AUTOCAD 2D.

CAREER HIGHLIGHTS
Piping Designer
Sirte Oil Company
January 2020 – Present, Brega, Libya
Brownfield Project:
- Methanol , Refinery, Gas plant, Power Plant, Desalination Plant, new Pipeline.

Tools: A utoCad Plant 3D / Spec editor and Autocad 2D

• As -Built drawing : plot plan t, P & ID, General Arrangements.
• Prepare HVAC drawing.
• Modification base on P & ID revision , determine location for Tie -in point.
• Site visit to ensure there is no obstacle during the implementation in the field.
• Meet with the Project engineer and discuss ion regarding several change size or route pipe related stress
• Work and share with other discipline.
• Deliverables including of piping GA’s, isometrics and material’s take -off.
• To co -ordinate with the other disciplines during all stages of design development, construction, pre -commissioning
and start -up.
• To provide technical support at site as required.
• Supervision during construction.




Senior Piping Designer
PT. Synergy Engineering
October 2019 – December 2019, Tangerang, Indonesia
Project: Bal tic Gas Project involves the development of the wellhead platform B4 and B6 in Poland exclusive.
Detail Engineering, Tools: PDMS (E3D), Navisworks
• Create equipment based on data sheet.
• Equipment layout based on plot plan.
• Piping routing from equipment to equipment base on P & ID.
• Pipe support (consider when the location can be combined with others pipe or tray).
• Consider with access (primary or secondary), laydown area, and maintenances access.
• Mechanical handling.
• Clashing detection.
• Data consistency.
• Review drawing with Navisworks .


Piping Supervisor
PT. JGC Indonesia
April 2019 – September 2019 (6 months), Jakarta, Indonesia
Project: De -bottlenecking Area Plant Polypropylene in Train 1, 2 and 3 at PT. Chandra Asri Petrochemical, Tbk.
Brownfield Project, Tools: AUTO CAD 2D
• To co -ordinate with the other disciplines during all stages of design development, construction, pre -commissioning
and start -up.
• To provide technical support at site as required.
• Monit oring progress thru site surveillance on daily basis.
• Verify Contractor weekly progress and commence site assessment.
• Dealing with Contractor related to change order with reference to the contractor.
• Dealing with Contractor related to construction progress ive.

• Controlling man -hours booked base on activity site.







Senior Piping Designer
PT. JGC Indonesia
January 2019 – March 2019 (3 months), Jakarta, Indonesia
Project: De -bottlenecking Area Plant Polypropylene in Train 1, 2 and 3 at PT. Chandra Asri P etrochemical, Tbk.
Brownfield Project, Tools: AUTO CAD 2D
• Modification base on P & ID revision , determine location for Tie -in point.
• Site visit.
• Meet with the client regarding several change size or route pipe related stress.
• Work and share with other discipline.
• Deliverables including of piping GA’s, isometrics and material’s take -off.
• To assist in the coordination of all activities related to piping engineering and design.



Senior Piping Designer
PT. Truba Jaya Engineering
October 2018 – December 2018 (3 months), Jakarta, Indonesia
Project: PLN (State Electricity Company under Indonesian Government) subsidiary to build 70 Mega Watt Gas Engine
power plant.
Greenfield Project, Tools: AUTO CAD 2D
• Routing pipe base on PID, plot plan and etc., provide pipe support base on pipe support standard, provide piping
arrangement and isometric.
• Prepare location of lay down area, work and share with other discipline.

Senior Piping Designer
KBR, Inc. (Kellogg Brown and Root)
April 2018 – September 2018 (5 months), Jakarta, Indonesia
Pre – Feed, Tools: AUTO CAD 2D
Project: Abadi LNG, INPEX Masela
• Site master plan and plot plan.
• Equipment layout based on PFD and UFD also follows requirements from Safety Department, prepare location of lay
down area, work and share with other discipline.

Senior Piping Designer
PT. Asia Pacific Rayon - Pulp and Paper Industry
January 2018 – March 2018 (3 months), Riau, Indonesia
Project: Chemical area CS2 and WSA
Greenfield Project, Tools: Au toCAD PLANT 3D
• Routing pipe base on PID, plot plan, provide pipe support base on pipe support standard, provide piping
arrangement and isometric.
• Prepare location of lay down area, work and share with other discipline.

Senior Piping Designer
KBR , Inc. (Kellogg Brown and Root)
March 2011 – April 2017 (6 years and 1 months), Jakarta, Indonesia

Project: MAERSK OIL Culzean Field Development of bridge -linked platforms comprising a 12 slots wellhead platform
(WHP), a central processing facility (CPF), and living quarters (LQ) capable of accommodating 100 people.
Detail Engineering, Tools: PDMS and MDS.
Scope of work: (CPF) Utility line and Compressor area.
• Create equipment based on data sheet.
• Design and review for nozzle orientation and platform equip ment
• Equipment layout base on plot plant.
• Piping routing from equipment to equipment by looking P&ID.
• Update isometric.
• Define support location with standard or special support.
• Consider to design mechanical handling, maintenance access, operation access on model.

Project: Pasific North West LNG Ltd, a subsidiary of Malaysia’s state - owned oil company (PETRONAS) and
Japan Petroleum Exploration Co, Ltd.
Feed, Tools: SP3D
Scope of work: LNG Storage and Loading.
• Create equipment based on data sheet.
• Design and review for nozzle orientation and platform equipment.
• Piping routing from equipment to equipment by looking P&ID.
• To do list updated.
• Update isometric.
• Consider to design with mechanical handling, maintenance access, and operation access on model.

Project: Mansuriya gas field development project, owned Turkish Petroleum.
Feed, Tools: SP3D
Scope of work: Gas and condensate separation.
• Create equipment based on data sheet/ vendor data.
• Design and review for nozzle orientation and platform equipment.
• Piping routi ng from equipment to equipment by looking P&ID.
• To do list updated.
• Update isometric.
• Prepare maintenance access, operation access on model.

Project: Shah Deniz Stage 2 Project – owned by BP.
Feed, Tools: PDMS/MDS
Scope of work: Utility line and Compresso r area in SDB - QU (LQ and Utilities Platform).
• Create equipment based on data sheet.
• Design and review for nozzle orientation and platform equipment.
• Equipment layout base on plot plant.
• Piping routing from equipment to equipment by looking P&ID.
• Update isometric.
• Prepare mechanical handling, maintenance access, operation access on model.

Project: Quad 204 FPSO – owned by BP.
Detail Engineering, Tools: PDMS/MDS
• Create Equipment based on data sheet.
• Design and review for nozzle orientation and plat form equipment.
• Equipment layout base on plot plant.
• Piping routing from equipment to equipment by looking P&ID.
• Update isometric.
• Define support location with standard or special support.
• Clash check.

• Prepare mechanical handling, maintenance access, opera tion access on model.

Project: Browser – LNG Project.
Scope of work: MTO.



Senior Piping Designer
JV between Technip and Malaysia Marine and Heavy Engineering ( MMHE ) Sdn. Bhd.
November 2009 – December 2010 (1 year and 2 months), Johor Bahru, Malaysia
Project: MCR -A topside and Gravity based structure (GBS).
Location: Turkmenistan – Caspian Sea
Detail Engineering and phase Construction, Tools: PDMS
• Re -routing if the construction team found the problem on the site.
• Update isometric.
• Update pipe support location.
• Extract MTO for support construction team.
• Line check.

Senior Piping Designer ( Checker ).
Sime Darby Engineering Sdn. Bhd.
May 2008 – October 2009 (1 year and 6 months) Johor Bahru, Malaysia
Project: Kumang CPP - Central Processing Platform and Tangga Barat Cluster Gas and Condensate Field .
Detail Engineering and phase Construction, Tools: PDMS
• Review and check isometric (line number, size, tag valve, instrument, flow, slope (if needed), check continued pipe.
• Check pipe support location in isometric use standard or special support.
• Check equipment and check nozzle (tag number, size, rating, and name to pipe).
• Clash check.
• Update Isometric.

PDMS Designer (Piping and Mechanical)
ALSTOM Power Energy System Indonesia
December 2006 – April 2008 (2 years and 6 months), Surabaya, Indonesia
Project: Castejon, Langage Energy Centre, Grain, and Aghada.
Detail Engineering and phase Construction, Tools: PDMS
• Responsible for developing the design graphic schedule based on scope of work under design graphic Group
Manager Supervision.
• Manages execution of the drafting in accordance with the customer specification, schedule requirements, applicable
codes and company’s standard.
• Recommend changes in design to simplify or improve basic designs in relates with design graphics area.
• Check the drawings for accuracy, completeness, and practicality of manufacture, installation, and maintenance.
• Responsible for reducing the repetition er rors.
• Assist manufacturing with the technical details of drafting work.
• Designing pipe routings based on P&ID drawings in 3D model which will be used to generate arrangement drawings,
fabrication drawings, and material list.
• Pipe routings between equipment & inside structure using PDMS 11.6.
• Spool drawings for fabrication/isometric drawing.
• MTO

Field Engineer
PT. Pelita Mustika Mandiri
July 2005 – January 2006 (9 months), Jakarta, Indonesia

Rental and provide installation of offshore/onshore facilities o f mud cooler.
Client: Conoco Philips, Chevron.
Project Planning Control Engineer
PT. Plimsoll Indonesia
August 2003 – August 2004 (1 year ), Surabaya, Indonesia

Rental and provide Installation of offshore and shipping facilities, winches, bollard etc.
Drafter ( Technical Assistance )
PT. Pan United Shipyard Indonesia
February 2002 – July 2003 (1 year and 6 months), Batam, Indonesia
Tools: Auto Cad
• Piping layout, piping section, isometric, and MTO report.
• Scope of work in repair and new shipbuilding.
Qual ity Control
PT. Dumas Tanjung Perak Shipyard
April 1998 – December 2001 (3 years and 9 months), Surabaya, Indonesia
Tools: Auto Cad
• Piping layout, piping section, isometric, and MTO report.
• Scope of work in repair and new shipbuilding.

Открыть контакты соискателя

Зарегистрируйтесь или войдите, чтобы увидеть контакты соискателя

Похожие резюме

27 ноября, 2021

Заместитель начальника АХО

Татьяна

Город

Южно-Сахалинск

Возраст

55 лет (29 сентября 2025)

отправить приглашение подробнее

3 декабря, 2021

Водитель

Андрей

Город

Южно-Сахалинск

Возраст

55 лет (29 сентября 2025)

отправить приглашение подробнее

6 декабря, 2021

Маляр по покраске металлоконструкций

Александр Шевченко

Город

Южно-Сахалинск

Возраст

55 лет (29 сентября 2025)

отправить приглашение подробнее
Все похожие резюме
Подпишитесь на похожие резюме
к поиску резюме

Рекомендованные вакансии

Дизайнер интерьера

Южно-Сахалинск, до 200 000 руб.

Графический дизайнер( ТРЦ Мега Березка )

Южно-Сахалинск, от 70 000  руб.

Графический дизайнер

Южно-Сахалинск, от 75 000  руб.

Популярные специализации
  • Другое
  • Продавец-консультант
  • Продавец-кассир
  • Менеджер по продажам
  • Менеджер по работе с клиентами
  • Повар
Инструменты соискателя
  • Разместить резюме
  • Найти работу
  • Поиск вакансий
  • Каталог вакансий
  • Соглашение по содействию в трудоустройстве
  • Защита персональных данных
  • Архивный каталог
  • Вакансии по профессиям
  • Поиск по городам
Инструменты работодателя
  • Разместить вакансию
  • Найти сотрудника
  • Поиск резюме
  • Каталог резюме
  • Тарифы
  • Информер с вакансиями
  • Резюме по профессиям
Больше всего ищут
  • Бармен
  • Брокер
  • Водитель такси
  • Корреспондент
  • Охранник
  • Переводчик

© 2007 - 2025 «Карьерист.ру»

  • О нас
  • Обратная связь