Key competence :
• 10+ years of technical experience on Oil & Gas projects gained in far north conditions ;
• Working knowledge of the application of the IEC, NEC, PUE, SNiP , GOST to industrial electrical installations and equipment;
• Experience in specification of medium and low voltage electrical distribution systems, Sw itchgear, Transformers and MCCs;
• Ability to review drawings, make changes to existin g drawings, and develop designs;
• Able to read and interpret vendor drawings, develop and check wiring diagrams based on schematics received from vendors or
developed by them or other engineers ;
• Able to work both collaboratively and independently;
• Highly motivated, well or ganized, resourceful and proactive;
• Upper -Intermediate English, both spoken and written;
• Confident with using Microsoft Office programs , Power BI, AutoCAD .
Working Experience:
December 201 9-currently
Company «KENTECH»
E&I Engineer
• Control the technical condition and safe operation of the equipment, participate in the investigation of the causes of its
failure.
• Participate in the development and implementation of technological charts, programs, labor organization projects.
• Develop proposals for standards of maintenance and repair of equipment.
• Organize acceptance from installation adjustment of newly installed equipment.
• Make schedules of maintenance and repair of instrumentation, measuring and automation systems.
• Provide performance of schedules of preventive inspections and various types of repair of instrumentation and control
equipment.
• Draw up requests for spare parts, materials, tools and measuring instruments.
August 2018 -November 2019
Company «Production Services Network Sakhalin»
Author (Design) Verification Coordinator (Electrical & Instruments)
• Ensure that all projects are installed in compliance with PSNS design requirements for Modifications projects;
• Inspection of installation works and review of associated documents (ITR's, ITP's test data, ect);
• Ensure all Engineering Queries and technical deviations have been correctly interpreted and complied with;
• Liaise with Project Engineers and Lead Engineers t o ensure all elements of design intent are included in site survey
scope;
• Provide engineering support to construction/commissioning phases as necessary.
March 2018 -August 2018
Company «Pacific Rim Constructors»
Electrical Engineer
• Develop of Procedures for c ompany electrical installations and systems in complianc e with Russian Regulations and
company’s adopted Standards;
• Prepare and check documentation as related to repair and maintenance of electrical equipment;
• Control that all scheduled and unscheduled maintenance activities carried out in full compliance with labor safety,
company safety rules and industrial sanitation rules;
• Man age and control review the Quality of Execution of maintenance activities such that Preventive Maintenance,
Inspections and Corrective Maintenance job routines are executed with the agreed work management plans in according
with World -class Standards ;
• Develop and implement actions to ensure energy saving activities and continuous efficiency saving programs ;
• Take part in inspections of the c ompany’s electrical installations.
August 2016 -March 2018
Company «KENTECH»
Electrical Engineer
• Implementation of control over the construction work;
• Implementation of works in accordance with the project documentation;
• Control over the executive documentation;
• Control over the compliance of the applied construction materials and the equipment with t he project documentation;
• Production control over the Quality of construction and installation works and technical record keeping with the
signature authority ;
• Engineering support to the organization .
Company «KENTECH»
December 2015 -August 2016
Electrical Laboratory Technician
• Operating documentation control ;
• Electrical drawings drafting;
• Thermographic testing and control of corresponding reports and documentation ;
• Testing of motor control units, instrument boards, transformers, generator wi ndings, solenoids and other electrical
equipment and its units as scheduled;
• Electrical and mechanical diagnostics of the equipment and its unscheduled and preventative maintenance;
• Control of production equipment and wiring schemes and technical documentation;
• Installation and technical maintenance of the equipment as scheduled;
• Planning and control of electrical equipment testing, its modification and updating.
January 2015 - December2015
Company “SMNM -VECO”
Electrical Technician
• Perform preventive and corrective maintenance on all electrical equipment of LNG plant;
• Install, Maintain, Inspect, and Troubleshoot & Repair: 0.4 -35kV or less systems, generators, transformers, breakers,
frequency converters , motor starters, UPS systems, electric heat tracing, lighting ;
• Replace faulty wiring and electrical components such as: relays, switches, motors, printed circuit boards and position
sensing devices;
• Testing and measuring in live electrical installation s to and above 1,000 V;
• Perform commissioning , post -repair tests and start up;
• Maintain, updаtеand keep equipment history records in SAP.
August 2012 - January 2015
Company “Sakhalinenergo”OAO Thermal Power S tation
Electrical Technician (Operative Personnel)
• Operative maintenance of electrical units up to and over 1000 Volts which includes: maintaining required operation
conditions of electrical units, performance of switching -over operations, equipment inspection, preparation for repair
(preparing of work place and arrangement of permit), technical main tenance of equipment, specified by manufacturer 's
instructions of operative personnel ;
• Ensure operation of electrical equipment and elimination of emergency situations ;
• Ensure quality and timely repairs and testing of electrical equipment;
• Assure safe operation .
August 2011 - August 2012
Company “SMNM -VECO”
Construction Electrician
• Equipment Installations (Transformers, Switchgear, Motor Control Centers , Motors, Battery Chargers, Panelboards );
• Insulated Wire and Cable Installation ;
• Wiring Insulation Tests ;
• Installation of Earthing, Overvoltage, and Lightning Protection System s;
• Installation of Heating cable ( Raychem, Thermon) on all instruments, taps, gauges and piping ;
• Installation of Electric Lighting System ;
• Connection of gas detectors, thermal detectors and fire detection devices .
Education :
2012 – 2015
USIEPI Yuzhno -Sakhalinsk Institute of Economics, Law and Informatics
Electrical Power Engineering
Electrical Engineer
2008 – 2012
Fuel and Energy Technical school
Technical Electrician
1996 – 1999
Higher Vocational School № 1
Technical Electrician
Certifications :
• Electrical Safety Level 5 up to 1000 V and above
• Safety trainings
• Confined Space Entry with SCBA
• Work at Height
15 июля, 2016
Сергей
Город
Южно-Сахалинск
Возраст
53 года (29 сентября 1971)
20 июля, 2016
Глеб
Город
Южно-Сахалинск
Возраст
38 лет (18 мая 1986)
21 октября, 2016
Татьяна
Город
Южно-Сахалинск
Возраст
54 года ( 7 сентября 1970)